Commercial
Grand Zenith Banquets Hall
Maligawattha • Completed 2022
Client
Grand Zenith Banquets Hall
Location
Maligawattha
Project Type
Passenger Lift
Floors Served
8
Elevators
3 Fuji Lifts (Higfh - Cap)
Completed
2022
The Challenge
Heavy Transit, High Stakes
Our Solution
State-of-the-Art Fuji Elevators
Execution Blueprint
Process & Technical Execution
01
Site Assessment & Engineering
02
Civil Construction
03
Equipment Import & Installation
04
Testing & Commissioning
Performance Metrics
Results & Impact
< 45s
Average Wait Time
Across 8 floors served by 3 synchronized lifts
30%
Power Savings
Achieved via Fuji regenerative drive feedback
Zero
Safety Incidents
Flawless operation history since commissioning
100%
Compliance Certified
Full pass on structural government inspection
"The elevator installation has transformed accessibility in our building. The Fuji elevators operate smoothly and reliably, handling our daily traffic of over 500 staff members with ease."
Director of Infrastructure
Grand Zenith Banquets Hall
Have a similar project in mind?
Contact our structural consultants and elevator engineers today to map out a custom high-performance blueprint for your architecture.